The flyover will allow a signal-less flow of traffic along National Highway 65 and Inner Ring Road, and will reduce travel time, as well as minimise noise and air pollution.
The flyover will facilitate smooth right-turn traffic flow from Owaisi junction to Vijayawada (towards Chinthalkunta) and to Nagarjunasagar along the Inner Ring Road. Alongside improving traffic efficiency, the flyover incorporates two loops on the left-hand side (LHS) up ramp towards LB Nagar for traffic originating from BN Reddy Nagar and Chintalkunta, and a right-hand side (RHS) down ramp toward Champapet for traffic from LB Nagar.
Completed on January 31 of this year, the flyover spans a total length of 1.78 kilometres, with the viaduct portion covering 1.30 kilometres.
Its dimensions include a standard span of 960 metres. The ramp section measures 481 metres, with specific lengths allocated for each ramp - 143 metres for Owaisi junction side ramp A, 212 metres for Chintalkunta side ramp B, and 126 metres for Nagarjunasagar side ramp C.
🚫 Do not repost without my permission 🚫
#dji #flyover #Ihs #rhs #traffic #Ibnagar #road #trafficmanagement #bridge #aerialphotography #dronephotography #phase1 #natgeo #natgeoyourshot #sagarringroad #hyderabad #instadaily #insta #instagramreels #viralreels #dronephotography #hyderabadlocals #samacaptures